Feed on
Posts
Comments

Archive for March, 2005

Site back up

The site was down for “repairs” for about a week, but now it’s back with a new layout, and a new version of wordpress. Complete with spam filtering! I still have some more tweeking to do, and I need to resurrect the walrus..

Read Full Post »

Kitchen Part V: Almost there…

The cabinets and countertop are in! The next phase of the project starts this weekend: compounding, retiling, and painting. I’m unskilled, pretty slow, and I lose interest in things quickly, so this will probably take me a couple of weeks to complete.
Although we’re not finished with the project yet, we couldn’t be more [...]

Read Full Post »

Kitchen part IV: Installation Day

Everything started today around 9am. Here are the pictures:

My worst fear came true! 2 of the pipes that supply water to the sink were directly in the way of our new drawer cabinet, and the guy doing the install wasn’t a plumber. I called my plumber (Aiello Plumbing) and they were on [...]

Read Full Post »

Kitchen part III: The messening

Tommorow they are coming to tear everything down, so I had to completely empty the kitchen tonite. Including dismantling the pantry. It took me hours to do, and it sucked, but I’m finally done.

Cabinets are totally empty, and ready to be dismantled.
Completely cleaned out the sink (which is going to be reused). [...]

Read Full Post »